Open Model Lab

June 2027: Final Integration + Public Portfolio

Turn the 12-month work into a showable, reproducible, publishable portfolio.

Gate status

Month
2027-06
Status
planned
Report
Final Technical Report

Success criterion

An open-source project demonstrates an end-to-end open-model research-engineering loop.

Focus

  • Repo cleanup.
  • Example configs.
  • Reproducible scripts.
  • Dashboard.
  • Combine reports into one final story.
  • Demo video.
  • README.
  • Public portfolio page.

Expected outputs

  • Final Open Model Research Harness version.
  • Final technical report and demo.
  • Public portfolio covering post-training, evals, agents, safety, and systems modules.

End-of-month decision

Is the project understandable, reproducible, and credible to an external research-engineering reader?